Contractors General Rules and Regulations Insurance Protection Loading Dock Use Moving Procedures Parking Smoking
Contractors
Page: 2 of 3 Back  |  Next

Work Rules:

THE ATRIUM AT ROCK SPRING PARK
CONTRACTOR RULES AND REGULATIONS

All work and deliveries must be scheduled with Property Management at least 24 hours in advance.

Contractors must check in at Property Management Office.

No smoking is allowed in the building or at the main entry door.

Contractors must use the freight elevator for all deliveries and movement through the building.

Contractors must receive prior approval from Property Management for any delivery of materials through the lobby.

The Contractor is responsible for the removal and hauling of trash. The building compactor cannot be used for any construction trash. No trash shall be left anywhere in the building (including elevators) at any time.

Contractors are responsible for their own parking.

Contractors are required to submit to an inspection of bags, boxes, and other items leaving the building.

Contractor is not permitted to perform work that will disturb other tenants during normal business hours (6:00 a.m. to 7:00 p.m. Monday through Friday). This includes loud or excessive noise and the use of chemicals, stains or paints that produce an odor.

Contractor must not block fire exits or fire corridors or use these areas for storage.

 

Powered by ETS. ©2024 All rights reserved. | |